E-128 Change of requirement [decided]

Belong to:

Management-results

Is part of:

E-20 Requirement specification

Description:

A change of requirement includes the description about a request for changing or widening, which should be considered. The alteration passes following states:

  • applied
  • evaluated
  • decided (agreed, declined, postponed)
In the state [decided] the alteration includes additional to the states [applied] and [evaluated] the description of the decision about the alteration:
  • What is the decision? (agreed, declined, postponed, passed on to the steering board)
  • How is the decision founded?
  • Date of the decision
  • Who had decided?

Result contains:

Tools:




Possible status:

  • applied
  • evaluated
  • agreed
  • declined
  • postponed
  • passed on to the steering board

  • Producing or changing from:

    A-283 Approve the alteration of a requirement

    Is needed for:

    QS-Note:

    Patter/Example:

    : :